
Harrow Drive, Aintree Village L1
Full Technical - Building
Demolition of existing building and construction of a new purpose built multi-function building.
Liverpool Royal Children's Hospital, L12
Feasibility/Technical
A new garden for the centre.
The Royal Liverpool NHS, Eaton Road, L12
Feasibility Study (Landscape)
Create a design for a proposed garden.
Former Earle Road United Reformed Church, L7
Feasibility Study (Building)
Change of entrance to centre.
Harrow Drive, Aintree, L10
Full Technical (Building)
Demolition of existing building and the construction of a new single story building in the grounds of Aintree playing fields.
164 Windsor Street, Toxteth, L8
Feasibility Study (Building)
Converting shop to new offices for the Chara Trust.
Earle Road, L7
Feasibility study - Building
To reorganise the former church to the group's requirements
Harrow Drive, Aintree, L10
Full Technical (Building)
Demolition of existing building and the construction of a new single story building in the grounds of Aintree playing fields.
8-10 Brougham Terrace, L6
Feasibility Study
Proposed Abdullah Quilliam Heritage Centre. The first purpose built mosque in the United Kingdom - 1889.
8 Canning Street, Toxteth L8
Full Technical
Internal alterations and improvements incorporating the re-introduction of two windows at basement level.
Ackers Hall Park, Dovecot L14
Full Technical (Landscape)
Refurbishment of the football pitch.
2 Speke Road, Garston L19
Feasibility Study (Planning Application)
Conversion of a former public house into a community building.
40 Catherine Street, L8
Feasibility Study and Full Technical
Refurbishment and alteration of existing ground floor and basement to improve facilities/layout to improve letting.
Blackburne Place, Hope Street Liverpool L8
Feasibility Study (Landscape)
Refurbishment of existing premises to remodel and extend to provide additional accommodation for future needs and accessibility.
c/o 80 Lark Lane L17
Full Technical
Single story extension housing a secure entrance lobby and enlarged reception.
c/o 80 Lark Lane L17
Feasibility Report
New security entrance lobby and reception area extension.
Belle Vale, L25
...
Proposed new youth and training centre.
![]() a-c | ![]() d-f | ![]() g-i |
![]() j-l | ![]() m-o | p-r |
![]() s-u | ![]() v-x | ![]() y-z |