
64 Mount Pleasant, Liverpool, L3
Feasibility Study
To design access ramp to the front door.
109 - 113 Great Mersey Street, L5
Feasibility and Full Technical (Building)
To provide full accessibility to all parts of the college.
109 - 113 Great Mersey Street, L5
Full Technical (Building)
Handrail to improve accessibility of external stairs.
Lambert Way, Islington, L3
Full Technical (Building)
General refurbishment and adaptation of vacant area on the ground floor of their existing premises into a small shop unit selling educational equipment and toys.
24 Hardman Street, L1
Feasibility Study
To provide an accessible WC and office pantry in Rail House.
Princes Stage, Pierhead L3
Feasibility Study with Estimate of Costs.
New operational offices and training centre at the Princes Stage, L3.
![]() a-c | ![]() d-f | ![]() g-i |
![]() j-l | ![]() m-o | p-r |
![]() s-u | ![]() v-x | ![]() y-z |